Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Ashton-under-Lyne, Greater Manchester

Wraparound extension in Ashton-under-Lyne

An L-shaped extension that fills the side return and runs across the back. If you live in Ashton-under-Lyne and want to know what a wraparound extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Ashton-under-Lyne is covered from our Greater Manchester round, including M34, M43, OL6 and OL7. In Ashton-under-Lyne we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Ashton-under-Lyne?

In Ashton-under-Lyne, our guide for a wraparound extension is £2,070–£3,380 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Wraparound extension prices in Ashton-under-Lyne
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,500–£74,500
L-shaped, about 30 m² of new floor£62,000–£101,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a wraparound extension in Ashton-under-Lyne?

The planning route for a wraparound extension in Ashton-under-Lyne is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Ashton-under-Lyne like to extend?

Stone and brick terraces are common around Ashton-under-Lyne. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a wraparound extension in Ashton-under-Lyne comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Wraparound extensions near Ashton-under-Lyne

Neighbouring places we cover include Dukinfield (1.1 miles) and Stalybridge (1.7 miles).

Other work in Ashton-under-Lyne:

All rear extensions in Ashton-under-Lyne

FAQ

Wraparound extension questions in Ashton-under-Lyne

Do you handle building control in Ashton-under-Lyne?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a wraparound take?

Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.

What postcode areas do you cover around Ashton-under-Lyne?

Including M34, M43, OL6, OL7, SK14 and SK16, and the surrounding Greater Manchester area.

Can you match the brick or stone on my Ashton-under-Lyne house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price