Sidcup, Greater London
Wraparound extension in Sidcup
An L-shaped extension that fills the side return and runs across the back. We design, get the approvals for and build wraparound extensions in Sidcup and the surrounding area, with one contract from the first survey to building control sign-off.
Sidcup sits in Greater London, with postcode districts including BR7, DA14 and DA15. In Sidcup we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a wraparound extension cost in Sidcup?
A wraparound extension in Sidcup is priced at £2,860–£4,680 per square metre including VAT as a guide, before kitchen fit-out and fees. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.
| Size | Guide price inc VAT |
|---|---|
| L-shaped, about 22 m² of new floor | £63,000–£103,000 |
| L-shaped, about 30 m² of new floor | £86,000–£140,500 |
We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a wraparound extension in Sidcup?
Planning for a wraparound extension in Sidcup follows the English householder rules.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Sidcup like to extend?
Sidcup is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a wraparound extension in Sidcup comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Wraparound extensions near Sidcup
Neighbouring places we cover include Chislehurst (1.6 miles) and Bexley (2.2 miles).
- Wraparound extension in Chislehurst
- Wraparound extension in Bexley
- Wraparound extension in Welling
- Wraparound extension in Eltham
- Wraparound extension in Bickley
Other work in Sidcup:
FAQ
Wraparound extension questions in Sidcup
Is the site visit in Sidcup free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Will it take a lot of garden?
Less than a deep rear extension of the same area, because part of the space comes from the side passage.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
How long does a rear extension take to build in Sidcup?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.