Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hornsey, Greater London

Wraparound extension in Hornsey

An L-shaped extension that fills the side return and runs across the back. We design, get the approvals for and build wraparound extensions in Hornsey and the surrounding area, with one contract from the first survey to building control sign-off.

Hornsey sits in Greater London, with postcode districts including N8, N10 and N22. In Hornsey we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Hornsey?

Guide prices for a wraparound extension in Hornsey start from our London rate of £2,860–£4,680 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Wraparound extension prices in Hornsey
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£63,000–£103,000
L-shaped, about 30 m² of new floor£86,000–£140,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a wraparound extension in Hornsey?

Planning for a wraparound extension in Hornsey follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Hornsey like to extend?

Much of Hornsey is Victorian and Edwardian terraced housing with narrow back additions, which suits side returns, wraparounds and 3 metre rear extensions. Many streets are in conservation areas, gardens are short, and almost everything comes through the house or along a rear alley.

How a wraparound extension in Hornsey comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Wraparound extensions near Hornsey

Close by, we work in Crouch End, about 0.5 miles away, and Muswell Hill, about 0.9 miles away.

Other work in Hornsey:

All rear extensions in Hornsey

FAQ

Wraparound extension questions in Hornsey

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do you handle building control in Hornsey?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

Do I need planning permission for a rear extension in Hornsey?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price