Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Chingford, Greater London

Wraparound extension in Chingford

For homes in Chingford, a wraparound extension is often the simplest way to gain space without moving. An L-shaped extension that fills the side return and runs across the back. We take it from survey to completion certificate.

Chingford and its postcode districts E4, IG8 and N9 are part of our Greater London coverage. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Greater London where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Chingford?

Guide prices for a wraparound extension in Chingford start from our London rate of £2,860–£4,680 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Wraparound extension prices in Chingford
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£63,000–£103,000
L-shaped, about 30 m² of new floor£86,000–£140,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a wraparound extension in Chingford?

Whether your wraparound extension in Chingford needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Chingford like to extend?

Much of Chingford is Victorian and Edwardian terraced housing with narrow back additions, which suits side returns, wraparounds and 3 metre rear extensions. Many streets are in conservation areas, gardens are short, and almost everything comes through the house or along a rear alley.

How a wraparound extension in Chingford comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Wraparound extensions near Chingford

We also build wraparound extensions in nearby Buckhurst Hill (1.4 miles) and Highams Park (1.6 miles).

Other work in Chingford:

All rear extensions in Chingford

FAQ

Wraparound extension questions in Chingford

Do you handle building control in Chingford?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will it take a lot of garden?

Less than a deep rear extension of the same area, because part of the space comes from the side passage.

How long does a rear extension take to build in Chingford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Chingford?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Is the site visit in Chingford free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price