Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Beckenham, Greater London

Wraparound extension in Beckenham

For homes in Beckenham, a wraparound extension is often the simplest way to gain space without moving. An L-shaped extension that fills the side return and runs across the back. We take it from survey to completion certificate.

Beckenham is covered from our Greater London round, including BR3, SE20 and SE26. Wraparound projects around Beckenham often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Beckenham?

In Beckenham, our guide for a wraparound extension is £2,860–£4,680 per square metre including VAT for a standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Wraparound extension prices in Beckenham
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£63,000–£103,000
L-shaped, about 30 m² of new floor£86,000–£140,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Beckenham?

Here is how the rules in England apply to a wraparound extension in Beckenham.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Beckenham like to extend?

Much of Beckenham is 1920s and 1930s semis and short terraces with longer gardens than inner London, which suit full-width single-storey rear extensions. Parking suspensions, skip licences and controlled hours on residential streets shape the programme more than the build itself.

How a wraparound extension in Beckenham comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Beckenham

Close by, we work in Perry Vale, about 2.1 miles away, and South Norwood, about 2.2 miles away.

Other work in Beckenham:

All rear extensions in Beckenham

FAQ

Wraparound extension questions in Beckenham

What postcode areas do you cover around Beckenham?

Including BR3, SE20 and SE26, and the surrounding Greater London area.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

How long does a rear extension take to build in Beckenham?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Beckenham?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price