Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Dumfries and Galloway

Wraparound extensions in Dumfries and Galloway

An L-shaped extension that fills the side return and runs across the back. Rear extensions in Dumfries and Galloway: we cover 4 towns including Dumfries, Stranraer and Annan, with design, approvals and the build under one contract.

L-shaped wraparound extension with a standing seam roof and large corner glazing on a Victorian end-of-terrace house

Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Dumfries and Galloway where a side return alone would leave the room too narrow. Dumfries and Galloway has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.

How much does a wraparound extension cost in Dumfries and Galloway?

For Dumfries and Galloway we work from the Scotland rate: £2,090–£3,420 per square metre of new floor, including VAT, standard specification. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Wraparound extension guide prices in Dumfries and Galloway
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£46,000–£75,000
L-shaped, about 30 m² of new floor£62,500–£102,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission in Dumfries and Galloway?

In Scotland side extensions are more restricted than rear ones under householder permitted development, and wraparounds generally need planning permission. A building warrant is required before work starts.

Scotland has no Party Wall Act. Work to shared walls is governed by property law and the title deeds, so we agree access and protection with neighbours in writing before work begins.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent.

Where in Dumfries and Galloway do we work?

FAQ

Questions people ask

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

How long does a wraparound take?

Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.

Can the corner be all glass?

Yes, with a steel or aluminium post or a structural glass corner. It needs careful thermal detailing to meet Building Regulations.

Do you cover all of Dumfries and Galloway?

We cover 4 towns and districts in Dumfries and Galloway, including Dumfries, Stranraer and Annan.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price