Newton Abbot, Devon
Wraparound extension in Newton Abbot
Wraparound extension in Newton Abbot: an L-shaped extension that fills the side return and runs across the back. We measure the house, show you what the rules allow, price it in writing and build it.
Newton Abbot is covered from our Devon round, including TQ12. Wraparound projects around Newton Abbot often involve two neighbours, so we start the party wall conversations early.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a wraparound extension cost in Newton Abbot?
For Newton Abbot we work from the South West England rate: £2,290–£3,740 per square metre of new floor, including VAT, standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.
| Size | Guide price inc VAT |
|---|---|
| L-shaped, about 22 m² of new floor | £50,500–£82,500 |
| L-shaped, about 30 m² of new floor | £68,500–£112,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a wraparound extension in Newton Abbot?
Here is how the rules in England apply to a wraparound extension in Newton Abbot.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Newton Abbot like to extend?
Stone-built and rendered houses are common around Newton Abbot, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.
How a wraparound extension in Newton Abbot comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Wraparound extensions near Newton Abbot
We also build wraparound extensions in nearby Kingsteignton (1.9 miles) and Cockington (5.1 miles).
- Wraparound extension in Kingsteignton
- Wraparound extension in Cockington
- Wraparound extension in Teignmouth
- Wraparound extension in Torquay
- Wraparound extension in Paignton
Other work in Newton Abbot:
FAQ
Wraparound extension questions in Newton Abbot
Is the site visit in Newton Abbot free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
How long does a rear extension take to build in Newton Abbot?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Is it worth it over a side return alone?
If you want a dining table and a sofa as well as the kitchen, usually yes.
Can you match the brick or stone on my Newton Abbot house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.