Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

County Antrim

Wraparound extensions in County Antrim

An L-shaped extension that fills the side return and runs across the back. Across County Antrim we handle the whole rear extension: survey, drawings, the planning route, building control and the build. Towns we cover here include Belfast, Lisburn and Newtownabbey.

L-shaped wraparound extension with a standing seam roof and large corner glazing on a Victorian end-of-terrace house

Wraparounds are the natural next step for the end-of-terrace and Victorian houses in County Antrim where a side return alone would leave the room too narrow. County Antrim has terraces near the centre, semis on the edges and many detached houses and bungalows in the surrounding countryside, where plots are often generous.

How much does a wraparound extension cost in County Antrim?

Guide prices for a wraparound extension in County Antrim start from our Northern Ireland rate of £1,910–£3,130 per square metre, including VAT. Northern Ireland prices are the lowest in our range.

Wraparound extension guide prices in County Antrim
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£42,000–£69,000
L-shaped, about 30 m² of new floor£57,500–£94,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission in County Antrim?

Northern Ireland's rules restrict side extensions more than rear ones, so a side infill or wraparound usually needs a planning application to the council as well as building control approval.

There is no Party Wall Act in Northern Ireland; we agree any work affecting a shared wall or boundary directly with the neighbour, in writing.

Conservation areas, Areas of Outstanding Natural Beauty and listed buildings restrict permitted development in Northern Ireland.

Where in County Antrim do we work?

FAQ

Questions people ask

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

How long does a wraparound take?

Usually 14 to 20 weeks on site, longer than a plain rear extension because of the steelwork.

Can the corner be all glass?

Yes, with a steel or aluminium post or a structural glass corner. It needs careful thermal detailing to meet Building Regulations.

Do you cover all of County Antrim?

We cover 7 towns and districts in County Antrim, including Belfast, Lisburn and Newtownabbey.

Who builds the extension?

Vetted building teams working under contract to us; your contract is with S&K Property Investments and Improvement Ltd.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price