Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Great Sankey, Cheshire

Wraparound extension in Great Sankey

For homes in Great Sankey, a wraparound extension is often the simplest way to gain space without moving. An L-shaped extension that fills the side return and runs across the back. We take it from survey to completion certificate.

We cover Great Sankey (WA5) as part of our Cheshire work. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Cheshire where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Great Sankey?

A wraparound extension in Great Sankey is priced at £2,070–£3,380 per square metre including VAT as a guide, before kitchen fit-out and fees. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Wraparound extension prices in Great Sankey
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,500–£74,500
L-shaped, about 30 m² of new floor£62,000–£101,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Great Sankey?

Whether your wraparound extension in Great Sankey needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Great Sankey like to extend?

Stone and brick terraces are common around Great Sankey. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a wraparound extension in Great Sankey comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Great Sankey

Neighbouring places we cover include Warrington (2.5 miles) and Newton-le-Willows (4.3 miles).

Other work in Great Sankey:

All rear extensions in Great Sankey

FAQ

Wraparound extension questions in Great Sankey

Do I need planning permission for a rear extension in Great Sankey?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can you match the brick or stone on my Great Sankey house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

How long does a rear extension take to build in Great Sankey?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Is the site visit in Great Sankey free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price