Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Epsom, Surrey

Terraced house rear extension in Epsom

Rear and side return extensions for terraces, with access through the house and two neighbours. We design, get the approvals for and build rear extensions for terraced houses in Epsom and the surrounding area, with one contract from the first survey to building control sign-off.

Epsom is covered from our Surrey round, including KT17 and KT19. On an Epsom terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Epsom?

For Epsom we work from the South East England rate: £2,300–£3,700 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Terraced house rear extension prices in Epsom
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£31,000–£50,000
3 m wide × 6 m deep (18 m²)£41,500–£66,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Epsom?

Here is how the rules in England apply to a terraced house rear extension in Epsom.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Epsom like to extend?

Commuter semis and detached houses make up much of Epsom, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a terraced house rear extension in Epsom comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Terraced house rear extensions near Epsom

Close by, we work in Ewell, about 1.6 miles away, and Ashtead, about 2.0 miles away.

Other work in Epsom:

All rear extensions in Epsom

FAQ

Terraced house rear extension questions in Epsom

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Is the site visit in Epsom free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do both neighbours need party wall notices?

Usually yes in England and Wales, because the extension often sits on or near both boundaries.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do you handle building control in Epsom?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How long does a rear extension take to build in Epsom?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price