Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Street, Somerset

Terraced house rear extension in Street

Thinking about a terraced house rear extension in Street? Rear and side return extensions for terraces, with access through the house and two neighbours. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Street is covered from our Somerset round, including BA16. On a Street terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Street?

For Street we work from the South West England rate: £2,130–£3,430 per square metre of new floor, including VAT, standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Terraced house rear extension prices in Street
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£29,000–£46,500
3 m wide × 6 m deep (18 m²)£38,500–£62,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Street?

Here is how the rules in England apply to a terraced house rear extension in Street.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Street like to extend?

Stone-built and rendered houses are common around Street, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new.

How a terraced house rear extension in Street comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Terraced house rear extensions near Street

Neighbouring places we cover include Wells (7.0 miles) and Shepton Mallet (9.5 miles).

Other work in Street:

All rear extensions in Street

FAQ

Terraced house rear extension questions in Street

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will my terrace be in a conservation area?

Many Victorian terraces are. Your council's map shows it; we check at the survey.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need planning permission for a rear extension in Street?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Street?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price