Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Nailsea, Somerset

Terraced house rear extension in Nailsea

Thinking about a terraced house rear extension in Nailsea? Rear and side return extensions for terraces, with access through the house and two neighbours. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Nailsea and its postcode districts BS48 are part of our Somerset coverage. On a Nailsea terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Nailsea?

Guide prices for a terraced house rear extension in Nailsea start from our South West England rate of £2,130–£3,430 per square metre, including VAT. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Terraced house rear extension prices in Nailsea
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£29,000–£46,500
3 m wide × 6 m deep (18 m²)£38,500–£62,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a terraced house rear extension in Nailsea?

Planning for a terraced house rear extension in Nailsea follows the English householder rules.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Nailsea like to extend?

Nailsea has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.

How a terraced house rear extension in Nailsea comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Nailsea

Close by, we work in Portishead, about 3.5 miles away, and Yatton, about 4.1 miles away.

Other work in Nailsea:

All rear extensions in Nailsea

FAQ

Terraced house rear extension questions in Nailsea

Can you match the brick or stone on my Nailsea house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How deep can I go on a terrace?

3 metres under permitted development in England, or up to 6 metres with prior approval outside designated land.

How long does a rear extension take to build in Nailsea?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price