Terraced house rear extension in Oxford
Rear and side return extensions for terraces, with access through the house and two neighbours. If you live in Oxford and want to know what a terraced house rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Oxford is covered from our Oxfordshire round, including OX1, OX2, OX3 and OX4. In Oxford we plan the delivery route through the house and the skip licence before anything else.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a terraced house rear extension cost in Oxford?
Guide prices for a terraced house rear extension in Oxford start from our South East England rate of £2,300–£3,700 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4.5 m deep (13.5 m²) | £31,000–£50,000 |
| 3 m wide × 6 m deep (18 m²) | £41,500–£66,500 |
We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a terraced house rear extension in Oxford?
Whether your terraced house rear extension in Oxford needs a planning application depends on its size, your house and any local restrictions.
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Oxford like to extend?
Oxford has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a terraced house rear extension in Oxford comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Terraced house rear extensions near Oxford
Neighbouring places we cover include Cowley (2.5 miles) and Kidlington (5.0 miles).
- Terraced house rear extension in Cowley
- Terraced house rear extension in Kidlington
- Terraced house rear extension in Abingdon
- Terraced house rear extension in Didcot
- Terraced house rear extension in Witney
Other work in Oxford:
FAQ
Terraced house rear extension questions in Oxford
Is the site visit in Oxford free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Do you handle building control in Oxford?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Can a terrace have a two-storey rear extension?
It is possible but harder to get through planning because of the effect on both neighbours.
How long does a rear extension take to build in Oxford?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.