Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Stamford, Lincolnshire

Terraced house rear extension in Stamford

For homes in Stamford, a terraced house rear extension is often the simplest way to gain space without moving. Rear and side return extensions for terraces, with access through the house and two neighbours. We take it from survey to completion certificate.

Stamford is covered from our Lincolnshire round, including PE9. On a Stamford terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Stamford?

In Stamford, our guide for a terraced house rear extension is £1,990–£3,200 per square metre including VAT for a standard specification. East Midlands prices sit a little below our West Midlands baseline.

Terraced house rear extension prices in Stamford
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£27,000–£43,000
3 m wide × 6 m deep (18 m²)£36,000–£57,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Stamford?

The planning route for a terraced house rear extension in Stamford is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Stamford like to extend?

Red-brick terraces and semis are typical of Stamford. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a terraced house rear extension in Stamford comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Terraced house rear extensions near Stamford

Neighbouring places we cover include Market Deeping (7.2 miles) and Bourne (9.1 miles).

Other work in Stamford:

All rear extensions in Stamford

FAQ

Terraced house rear extension questions in Stamford

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do I need planning permission for a rear extension in Stamford?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How deep can I go on a terrace?

3 metres under permitted development in England, or up to 6 metres with prior approval outside designated land.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Stamford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price