Royston, Hertfordshire
Terraced house rear extension in Royston
Thinking about a terraced house rear extension in Royston? Rear and side return extensions for terraces, with access through the house and two neighbours. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Royston and its postcode districts SG8 are part of our Hertfordshire coverage. In Royston we plan the delivery route through the house and the skip licence before anything else.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a terraced house rear extension cost in Royston?
A terraced house rear extension in Royston is priced at £2,170–£3,500 per square metre including VAT as a guide, before kitchen fit-out and fees. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4.5 m deep (13.5 m²) | £29,500–£47,000 |
| 3 m wide × 6 m deep (18 m²) | £39,000–£63,000 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a terraced house rear extension in Royston?
Here is how the rules in England apply to a terraced house rear extension in Royston.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Royston like to extend?
Post-war semis and newer estates are typical of Royston, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.
How a terraced house rear extension in Royston comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Terraced house rear extensions near Royston
From Royston, the nearest places we also cover are Baldock (8.1 miles) and Letchworth Garden City (9.8 miles).
- Terraced house rear extension in Baldock
- Terraced house rear extension in Letchworth Garden City
- Terraced house rear extension in Biggleswade
- Terraced house rear extension in Henlow
- Terraced house rear extension in Saffron Walden
Other work in Royston:
FAQ
Terraced house rear extension questions in Royston
What postcode areas do you cover around Royston?
Including SG8, and the surrounding Hertfordshire area.
Do I need planning permission for a rear extension in Royston?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Can a terrace have a two-storey rear extension?
It is possible but harder to get through planning because of the effect on both neighbours.
How long does a rear extension take to build in Royston?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can you match the brick or stone on my Royston house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.