Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Emerson Park, Greater London

Terraced house rear extension in Emerson Park

We plan and build rear extensions for terraced houses for homeowners in Emerson Park. Rear and side return extensions for terraces, with access through the house and two neighbours. Start with a free site visit, then a written price once the design is agreed.

Emerson Park sits in Greater London, with postcode districts including RM2, RM3 and RM11. In Emerson Park we plan the delivery route through the house and the skip licence before anything else.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Emerson Park?

For Emerson Park we work from the London rate: £2,660–£4,290 per square metre of new floor, including VAT, standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Terraced house rear extension prices in Emerson Park
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£36,000–£58,000
3 m wide × 6 m deep (18 m²)£48,000–£77,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a terraced house rear extension in Emerson Park?

Whether your terraced house rear extension in Emerson Park needs a planning application depends on its size, your house and any local restrictions.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Emerson Park like to extend?

Much of Emerson Park is 1920s and 1930s semis and short terraces with longer gardens than inner London, which suit full-width single-storey rear extensions. Parking suspensions, skip licences and controlled hours on residential streets shape the programme more than the build itself.

How a terraced house rear extension in Emerson Park comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Terraced house rear extensions near Emerson Park

We also build rear extensions for terraced houses in nearby Harold Wood (1.3 miles) and Hornchurch (1.4 miles).

Other work in Emerson Park:

All rear extensions in Emerson Park

FAQ

Terraced house rear extension questions in Emerson Park

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need planning permission for a rear extension in Emerson Park?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do both neighbours need party wall notices?

Usually yes in England and Wales, because the extension often sits on or near both boundaries.

Do you handle building control in Emerson Park?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Emerson Park?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price