Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Brentford, Greater London

Terraced house rear extension in Brentford

Thinking about a terraced house rear extension in Brentford? Rear and side return extensions for terraces, with access through the house and two neighbours. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

We cover Brentford (TW7, TW8 and TW9) as part of our Greater London work. In Brentford we plan the delivery route through the house and the skip licence before anything else.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Brentford?

A terraced house rear extension in Brentford is priced at £2,660–£4,290 per square metre including VAT as a guide, before kitchen fit-out and fees. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Terraced house rear extension prices in Brentford
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£36,000–£58,000
3 m wide × 6 m deep (18 m²)£48,000–£77,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Brentford?

The planning route for a terraced house rear extension in Brentford is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Brentford like to extend?

Brentford is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first. On a Brentford terrace both neighbours usually need party wall notices or agreement, so we talk to them early.

How a terraced house rear extension in Brentford comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Terraced house rear extensions near Brentford

We also build rear extensions for terraced houses in nearby Kew (0.9 miles) and Ealing Common (1.5 miles).

Other work in Brentford:

All rear extensions in Brentford

FAQ

Terraced house rear extension questions in Brentford

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Is the site visit in Brentford free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can you build without side access?

Yes. Materials come through the house in protected runs or over the roof by crane on tight sites.

How long does a rear extension take to build in Brentford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need planning permission for a rear extension in Brentford?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price