Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Sunninghill, Berkshire

Terraced house rear extension in Sunninghill

Rear and side return extensions for terraces, with access through the house and two neighbours. If you live in Sunninghill and want to know what a terraced house rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Sunninghill sits in Berkshire, with postcode districts including SL5. In Sunninghill we plan the delivery route through the house and the skip licence before anything else.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a terraced house rear extension cost in Sunninghill?

In Sunninghill, our guide for a terraced house rear extension is £2,300–£3,700 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Terraced house rear extension prices in Sunninghill
SizeGuide price inc VAT
3 m wide × 4.5 m deep (13.5 m²)£31,000–£50,000
3 m wide × 6 m deep (18 m²)£41,500–£66,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a terraced house rear extension in Sunninghill?

Whether your terraced house rear extension in Sunninghill needs a planning application depends on its size, your house and any local restrictions.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Sunninghill like to extend?

Sunninghill has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a terraced house rear extension in Sunninghill comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Terraced house rear extensions near Sunninghill

We also build rear extensions for terraced houses in nearby Ascot (1.1 miles) and Bracknell (4.2 miles).

Other work in Sunninghill:

All rear extensions in Sunninghill

FAQ

Terraced house rear extension questions in Sunninghill

Is the site visit in Sunninghill free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do I need planning permission for a rear extension in Sunninghill?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can a terrace have a two-storey rear extension?

It is possible but harder to get through planning because of the effect on both neighbours.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Sunninghill?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Sunninghill?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price