Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Stourport-on-Severn, Worcestershire

Single-storey rear extension in Stourport-on-Severn

We plan and build single-storey rear extensions for homeowners in Stourport-on-Severn. Ground-floor space across the back of the house, usually for a kitchen, dining or family room. Start with a free site visit, then a written price once the design is agreed.

Stourport-on-Severn and its postcode districts DY13 are part of our Worcestershire coverage. A depth of 3 to 4 metres keeps many single-storey rear extensions in Stourport-on-Severn within permitted development, subject to the house's planning history.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Stourport-on-Severn?

A single-storey rear extension in Stourport-on-Severn is priced at £1,900–£3,100 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.

Single-storey rear extension prices in Stourport-on-Severn
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£23,000–£37,000
4 m wide × 5 m deep (20 m²)£38,000–£62,000
4 m wide × 6 m deep (24 m²)£45,500–£74,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a single-storey rear extension in Stourport-on-Severn?

Whether your single-storey rear extension in Stourport-on-Severn needs a planning application depends on its size, your house and any local restrictions.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Stourport-on-Severn like to extend?

Red-brick terraces and 1930s semis make up much of Stourport-on-Severn. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a single-storey rear extension in Stourport-on-Severn comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Single-storey rear extensions near Stourport-on-Severn

Neighbouring places we cover include Kidderminster (3.6 miles) and Droitwich (7.5 miles).

Other work in Stourport-on-Severn:

All rear extensions in Stourport-on-Severn

FAQ

Single-storey rear extension questions in Stourport-on-Severn

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How deep can a single-storey rear extension be without planning?

In England, 3 metres on an attached house and 4 metres on a detached house under permitted development, or up to 6 and 8 metres with prior approval. Wales allows 4 metres; Scotland and Northern Ireland have their own limits.

How long does a rear extension take to build in Stourport-on-Severn?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Can you match the brick or stone on my Stourport-on-Severn house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price