Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Banbury, Oxfordshire

Single-storey rear extension in Banbury

Single-storey rear extension in Banbury: ground-floor space across the back of the house, usually for a kitchen, dining or family room. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Banbury (OX16) as part of our Oxfordshire work. A depth of 3 to 4 metres keeps many single-storey rear extensions in Banbury within permitted development, subject to the house's planning history.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Banbury?

A single-storey rear extension in Banbury is priced at £2,130–£3,470 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Single-storey rear extension prices in Banbury
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a single-storey rear extension in Banbury?

Here is how the rules in England apply to a single-storey rear extension in Banbury.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Banbury like to extend?

Banbury has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a single-storey rear extension in Banbury comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Single-storey rear extensions near Banbury

Close by, we work in Brackley, about 8.4 miles away, and Bicester, about 13.8 miles away.

Other work in Banbury:

All rear extensions in Banbury

FAQ

Single-storey rear extension questions in Banbury

Do I need planning permission for a rear extension in Banbury?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Banbury?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will the extension make the room behind it dark?

Not if it is designed well. Rooflights or a lantern over the old back room, and a wide opening into it, keep daylight reaching the middle of the house.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Can you match the brick or stone on my Banbury house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price