Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Caerleon, Newport and Monmouthshire

Single-storey rear extension in Caerleon

For homes in Caerleon, a single-storey rear extension is often the simplest way to gain space without moving. Ground-floor space across the back of the house, usually for a kitchen, dining or family room. We take it from survey to completion certificate.

Caerleon sits in Newport and Monmouthshire, with postcode districts including NP18. A single-storey rear extension in Caerleon is mostly built from the garden side, so the house stays usable for most of the job.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Caerleon?

In Caerleon, our guide for a single-storey rear extension is £1,770–£2,880 per square metre including VAT for a standard specification. Prices in Wales sit below our West Midlands baseline; sloping sites are the main variable.

Single-storey rear extension prices in Caerleon
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,000–£34,500
4 m wide × 5 m deep (20 m²)£35,500–£57,500
4 m wide × 6 m deep (24 m²)£42,500–£69,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a single-storey rear extension in Caerleon?

The planning route for a single-storey rear extension in Caerleon is set by Wales's householder rules and your council.

In Wales a single-storey rear extension can often be permitted development if it projects no more than 4 metres beyond the rear wall and is no more than 4 metres high. Wales has no prior approval route for deeper extensions, so anything bigger needs a householder planning application.

Conservation areas, National Parks and National Landscapes restrict permitted development in Wales, and listed buildings need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development or a householder planning application.

What are homes in Caerleon like to extend?

Caerleon has Victorian terraces near the centre and semis further out. Welsh permitted development allows up to 4 metres at the rear for many houses.

How a single-storey rear extension in Caerleon comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Single-storey rear extensions near Caerleon

Close by, we work in Newport, about 2.4 miles away, and Cwmbran, about 4.3 miles away.

Other work in Caerleon:

All rear extensions in Caerleon

FAQ

Single-storey rear extension questions in Caerleon

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do you handle building control in Caerleon?

Yes. We apply to the council or a registered approver under the Welsh regulations and hand over the completion certificate.

Do I need a structural engineer?

Yes for the beam over the new opening and usually for the foundations. Their calculations go to building control with the drawings.

Do I need planning permission for a rear extension in Caerleon?

Often not for a single-storey rear extension of up to 4 metres under Welsh permitted development. Wales has no prior approval route for deeper extensions.

How long does a rear extension take to build in Caerleon?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price