Burnley, Lancashire
Single-storey rear extension in Burnley
Single-storey rear extension in Burnley: ground-floor space across the back of the house, usually for a kitchen, dining or family room. We measure the house, show you what the rules allow, price it in writing and build it.
Burnley sits in Lancashire, with postcode districts including BB10 and BB11. A depth of 3 to 4 metres keeps many single-storey rear extensions in Burnley within permitted development, subject to the house's planning history.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a single-storey rear extension cost in Burnley?
In Burnley, our guide for a single-storey rear extension is £1,790–£2,910 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,500–£35,000 |
| 4 m wide × 5 m deep (20 m²) | £35,500–£58,500 |
| 4 m wide × 6 m deep (24 m²) | £43,000–£70,000 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a single-storey rear extension in Burnley?
Planning for a single-storey rear extension in Burnley follows the English householder rules.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Burnley like to extend?
Burnley has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.
How a single-storey rear extension in Burnley comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Single-storey rear extensions near Burnley
From Burnley, the nearest places we also cover are Brierfield (1.7 miles) and Nelson (2.7 miles).
- Single-storey rear extension in Brierfield
- Single-storey rear extension in Nelson
- Single-storey rear extension in Padiham
- Single-storey rear extension in Colne
- Single-storey rear extension in Accrington
Other work in Burnley:
FAQ
Single-storey rear extension questions in Burnley
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Does it add value to the house?
Nationwide's October 2025 house price research found that a 10% increase in floor area is linked to about 5% higher value on average. It is a guide, not a promise; local agents can tell you what extended homes on your street sell for.
Do I need planning permission for a rear extension in Burnley?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.