Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Sevenoaks, Kent

Single-storey rear extension in Sevenoaks

For homes in Sevenoaks, a single-storey rear extension is often the simplest way to gain space without moving. Ground-floor space across the back of the house, usually for a kitchen, dining or family room. We take it from survey to completion certificate.

Sevenoaks sits in Kent, with postcode districts including TN13. On inter-war semis and 1960s estates like those around Sevenoaks, a single-storey rear extension is usually the simplest way to fix a small back kitchen without touching the bedrooms.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Sevenoaks?

In Sevenoaks, our guide for a single-storey rear extension is £2,130–£3,470 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Single-storey rear extension prices in Sevenoaks
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a single-storey rear extension in Sevenoaks?

Whether your single-storey rear extension in Sevenoaks needs a planning application depends on its size, your house and any local restrictions.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Sevenoaks like to extend?

Around Sevenoaks the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a single-storey rear extension in Sevenoaks comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Single-storey rear extensions near Sevenoaks

Neighbouring places we cover include Chelsfield (6.5 miles) and Tonbridge (6.5 miles).

Other work in Sevenoaks:

All rear extensions in Sevenoaks

FAQ

Single-storey rear extension questions in Sevenoaks

Do I need planning permission for a rear extension in Sevenoaks?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Sevenoaks?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a structural engineer?

Yes for the beam over the new opening and usually for the foundations. Their calculations go to building control with the drawings.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How much does a single-storey rear extension cost in Sevenoaks?

As a guide, £2,130–£3,470 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £25,500–£41,500 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price