Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hythe, Kent

Single-storey rear extension in Hythe

We plan and build single-storey rear extensions for homeowners in Hythe. Ground-floor space across the back of the house, usually for a kitchen, dining or family room. Start with a free site visit, then a written price once the design is agreed.

Hythe sits in Kent, with postcode districts including CT21. A single-storey rear extension in Hythe is mostly built from the garden side, so the house stays usable for most of the job.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Hythe?

For Hythe we work from the South East England rate: £2,130–£3,470 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Single-storey rear extension prices in Hythe
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a single-storey rear extension in Hythe?

The planning route for a single-storey rear extension in Hythe is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Hythe like to extend?

Commuter semis and detached houses make up much of Hythe, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a single-storey rear extension in Hythe comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Single-storey rear extensions near Hythe

We also build single-storey rear extensions in nearby Folkestone (3.7 miles) and Ashford (10.5 miles).

Other work in Hythe:

All rear extensions in Hythe

FAQ

Single-storey rear extension questions in Hythe

How long does a rear extension take to build in Hythe?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can you match the brick or stone on my Hythe house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Can I stay in the house during the build?

Usually yes. The noisiest, dustiest stage, removing the back wall, is kept to the final weeks and screened off. Most families set up a temporary kitchen elsewhere in the house.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Is the site visit in Hythe free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price