Kenley, Greater London
Single-storey rear extension in Kenley
Ground-floor space across the back of the house, usually for a kitchen, dining or family room. We design, get the approvals for and build single-storey rear extensions in Kenley and the surrounding area, with one contract from the first survey to building control sign-off.
We cover Kenley (CR2, CR5 and CR8) as part of our Greater London work. A depth of 3 to 4 metres keeps many single-storey rear extensions in Kenley within permitted development, subject to the house's planning history.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a single-storey rear extension cost in Kenley?
In Kenley, our guide for a single-storey rear extension is £2,470–£4,030 per square metre including VAT for a standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £29,500–£48,500 |
| 4 m wide × 5 m deep (20 m²) | £49,500–£80,500 |
| 4 m wide × 6 m deep (24 m²) | £59,500–£96,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a single-storey rear extension in Kenley?
Planning for a single-storey rear extension in Kenley follows the English householder rules.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Kenley like to extend?
Kenley is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a single-storey rear extension in Kenley comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Single-storey rear extensions near Kenley
Neighbouring places we cover include Purley (0.9 miles) and Sanderstead (1.2 miles).
- Single-storey rear extension in Purley
- Single-storey rear extension in Sanderstead
- Single-storey rear extension in Coulsdon
- Single-storey rear extension in South Croydon
- Single-storey rear extension in Caterham
Other work in Kenley:
FAQ
Single-storey rear extension questions in Kenley
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
How long does a rear extension take to build in Kenley?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Is a flat roof or a pitched roof better?
A warm flat roof keeps the extension low under first-floor windows and suits a roof lantern; a pitched or lean-to roof gives a vaulted ceiling. Both last for decades when built properly.
Is the site visit in Kenley free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Do I need planning permission for a rear extension in Kenley?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.