Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Forfar, Dundee and Angus

Single-storey rear extension in Forfar

Ground-floor space across the back of the house, usually for a kitchen, dining or family room. If you live in Forfar and want to know what a single-storey rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

We cover Forfar (DD8) as part of our Dundee and Angus work. A depth of 3 to 4 metres keeps many single-storey rear extensions in Forfar within permitted development, subject to the house's planning history.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Forfar?

Guide prices for a single-storey rear extension in Forfar start from our Scotland rate of £1,800–£2,940 per square metre, including VAT. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Single-storey rear extension prices in Forfar
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,500–£35,500
4 m wide × 5 m deep (20 m²)£36,000–£59,000
4 m wide × 6 m deep (24 m²)£43,500–£70,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a single-storey rear extension in Forfar?

Here is how the rules in Scotland apply to a single-storey rear extension in Forfar.

In Scotland a single-storey rear extension can be permitted development under Class 1A: eaves no higher than 3 metres and an overall height of 4 metres, and where any part is within 1 metre of a boundary it can project no more than 3 metres on a terraced house or 4 metres on other houses. The rights do not apply in conservation areas, and a building warrant is still needed before work starts.

Scotland has no larger-extension prior approval route; extensions beyond permitted development need a planning application.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Forfar like to extend?

Forfar has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.

How a single-storey rear extension in Forfar comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning or permitted development, the building warrant, structural design and neighbour agreements are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Single-storey rear extensions near Forfar

From Forfar, the nearest places we also cover are Brechin (10.6 miles) and Carnoustie (12.0 miles).

Other work in Forfar:

All rear extensions in Forfar

FAQ

Single-storey rear extension questions in Forfar

Do I need a party wall agreement?

Scotland has no Party Wall Act; we agree access and protection with your neighbour in writing instead.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I stay in the house during the build?

Usually yes. The noisiest, dustiest stage, removing the back wall, is kept to the final weeks and screened off. Most families set up a temporary kitchen elsewhere in the house.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Forfar?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price