Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Biggleswade, Bedfordshire

Single-storey rear extension in Biggleswade

Ground-floor space across the back of the house, usually for a kitchen, dining or family room. If you live in Biggleswade and want to know what a single-storey rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.

We cover Biggleswade (SG18) as part of our Bedfordshire work. A depth of 3 to 4 metres keeps many single-storey rear extensions in Biggleswade within permitted development, subject to the house's planning history.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Biggleswade?

A single-storey rear extension in Biggleswade is priced at £2,010–£3,290 per square metre including VAT as a guide, before kitchen fit-out and fees. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Single-storey rear extension prices in Biggleswade
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£24,000–£39,500
4 m wide × 5 m deep (20 m²)£40,500–£65,500
4 m wide × 6 m deep (24 m²)£48,500–£79,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a single-storey rear extension in Biggleswade?

The planning route for a single-storey rear extension in Biggleswade is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Biggleswade like to extend?

Post-war semis and newer estates are typical of Biggleswade, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a single-storey rear extension in Biggleswade comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Single-storey rear extensions near Biggleswade

Neighbouring places we cover include Sandy (3.1 miles) and Henlow (4.0 miles).

Other work in Biggleswade:

All rear extensions in Biggleswade

FAQ

Single-storey rear extension questions in Biggleswade

Do you handle building control in Biggleswade?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can I stay in the house during the build?

Usually yes. The noisiest, dustiest stage, removing the back wall, is kept to the final weeks and screened off. Most families set up a temporary kitchen elsewhere in the house.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need planning permission for a rear extension in Biggleswade?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

How long does a rear extension take to build in Biggleswade?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price