Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Mirfield, West Yorkshire

Side return extension in Mirfield

We plan and build side return extensions for homeowners in Mirfield. Infilling the narrow passage beside a Victorian or Edwardian back addition. Start with a free site visit, then a written price once the design is agreed.

Mirfield and its postcode districts WF14 are part of our West Yorkshire coverage. Side return projects in Mirfield usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Mirfield?

Guide prices for a side return extension in Mirfield start from our Yorkshire and the Humber rate of £2,140–£3,530 per square metre, including VAT. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Side return extension prices in Mirfield
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£25,500–£42,500
2.5 m wide × 7 m deep (17.5 m²)£37,500–£62,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a side return extension in Mirfield?

Planning for a side return extension in Mirfield follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Mirfield like to extend?

Stone terraces and brick semis are typical of Mirfield. Matching sandstone or gritstone on a terrace is one of the biggest cost variables, and reclaimed stone is often the best match.

How a side return extension in Mirfield comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Mirfield

From Mirfield, the nearest places we also cover are Liversedge (2.2 miles) and Heckmondwike (2.4 miles).

Other work in Mirfield:

All rear extensions in Mirfield

FAQ

Side return extension questions in Mirfield

How much does a side return extension cost in Mirfield?

As a guide, £2,140–£3,530 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £25,500–£42,500 at that rate. Your written price follows the survey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Glass roof or solid roof with rooflights?

A glass roof gives the most light; a solid roof with long rooflights is warmer and quieter in rain. Both work.

Do you handle building control in Mirfield?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How long does a rear extension take to build in Mirfield?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price