Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Rustington, West Sussex

Side return extension in Rustington

Infilling the narrow passage beside a Victorian or Edwardian back addition. If you live in Rustington and want to know what a side return extension would cost and whether it needs planning, start with the online guide price or a free site visit.

We cover Rustington (BN16) as part of our West Sussex work. Side return projects in Rustington usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Rustington?

For Rustington we work from the South East England rate: £2,580–£4,260 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Side return extension prices in Rustington
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£31,000–£51,000
2.5 m wide × 7 m deep (17.5 m²)£45,000–£74,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Rustington?

Whether your side return extension in Rustington needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Rustington like to extend?

Commuter semis and detached houses make up much of Rustington, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a side return extension in Rustington comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Rustington

From Rustington, the nearest places we also cover are Littlehampton (1.5 miles) and Worthing (5.8 miles).

Other work in Rustington:

All rear extensions in Rustington

FAQ

Side return extension questions in Rustington

Is the site visit in Rustington free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Is a side return permitted development?

Sometimes, as a side extension within the width and height limits, but not in conservation areas, and many terraces are in one.

How long does a rear extension take to build in Rustington?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price