Side return extension in Aston
For homes in Aston, a side return extension is often the simplest way to gain space without moving. Infilling the narrow passage beside a Victorian or Edwardian back addition. We take it from survey to completion certificate.
Aston is covered from our West Midlands round, including B6, B7 and B19. Side returns suit the Victorian and Edwardian terraces found across parts of the West Midlands, where the kitchen sits in a narrow back addition.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a side return extension cost in Aston?
In Aston, our guide for a side return extension is £2,300–£3,800 per square metre including VAT for a standard specification. The West Midlands is the baseline for our guide prices.
| Size | Guide price inc VAT |
|---|---|
| 2 m wide × 6 m deep (12 m²) | £27,500–£45,500 |
| 2.5 m wide × 7 m deep (17.5 m²) | £40,500–£66,500 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a side return extension in Aston?
Here is how the rules in England apply to a side return extension in Aston.
In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.
Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Aston like to extend?
Red-brick terraces and 1930s semis make up much of Aston. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.
How a side return extension in Aston comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Side return extensions near Aston
Close by, we work in Hockley, about 1.4 miles away, and Birmingham, about 1.5 miles away.
- Side return extension in Hockley
- Side return extension in Birmingham
- Side return extension in Washwood Heath
- Side return extension in Smethwick
- Side return extension in Castle Vale
Other work in Aston:
FAQ
Side return extension questions in Aston
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Can I combine a side return with a rear extension?
Yes; that is a wraparound extension, and it gives the biggest open-plan room a terrace can have.
How much does a side return extension cost in Aston?
As a guide, £2,300–£3,800 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £27,500–£45,500 at that rate. Your written price follows the survey.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
How long does a rear extension take to build in Aston?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.