Haslemere, Surrey
Side return extension in Haslemere
Thinking about a side return extension in Haslemere? Infilling the narrow passage beside a Victorian or Edwardian back addition. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Haslemere sits in Surrey, with postcode districts including GU26 and GU27. In Haslemere we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a side return extension cost in Haslemere?
In Haslemere, our guide for a side return extension is £2,580–£4,260 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 2 m wide × 6 m deep (12 m²) | £31,000–£51,000 |
| 2.5 m wide × 7 m deep (17.5 m²) | £45,000–£74,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a side return extension in Haslemere?
Planning for a side return extension in Haslemere follows the English householder rules.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Haslemere like to extend?
Haslemere has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a side return extension in Haslemere comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Side return extensions near Haslemere
Close by, we work in Bordon, about 6.9 miles away, and Godalming, about 7.7 miles away.
- Side return extension in Bordon
- Side return extension in Godalming
- Side return extension in Farnham
- Side return extension in Hale
- Side return extension in Cranleigh
Other work in Haslemere:
FAQ
Side return extension questions in Haslemere
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Do you handle building control in Haslemere?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Do I need my neighbour's permission?
Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Is the site visit in Haslemere free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Do I need planning permission for a rear extension in Haslemere?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.