Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Telford, Shropshire

Side return extension in Telford

For homes in Telford, a side return extension is often the simplest way to gain space without moving. Infilling the narrow passage beside a Victorian or Edwardian back addition. We take it from survey to completion certificate.

We cover Telford (TF4) as part of our Shropshire work. Side returns suit the Victorian and Edwardian terraces found across parts of Shropshire, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Telford?

Guide prices for a side return extension in Telford start from our West Midlands rate of £2,300–£3,800 per square metre, including VAT. The West Midlands is the baseline for our guide prices.

Side return extension prices in Telford
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,500–£45,500
2.5 m wide × 7 m deep (17.5 m²)£40,500–£66,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Telford?

The planning route for a side return extension in Telford is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Telford like to extend?

Telford has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a side return extension in Telford comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Telford

Close by, we work in Hadley, about 2.2 miles away, and Wellington, about 3.3 miles away.

Other work in Telford:

All rear extensions in Telford

FAQ

Side return extension questions in Telford

Do you handle building control in Telford?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

What postcode areas do you cover around Telford?

Including TF4, and the surrounding Shropshire area.

How long does a rear extension take to build in Telford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price