Daventry, Northamptonshire

Side return extension in Daventry

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Daventry and the surrounding area, with one contract from the first survey to building control sign-off.

Daventry and its postcode districts NN11 are part of our Northamptonshire coverage. In Daventry we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Daventry?

A side return extension in Daventry is priced at £2,230–£3,690 per square metre including VAT as a guide, before kitchen fit-out and fees. East Midlands prices sit a little below our West Midlands baseline.

Side return extension prices in Daventry
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,000–£44,000
2.5 m wide × 7 m deep (17.5 m²)£39,000–£64,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a side return extension in Daventry?

Here is how the rules in England apply to a side return extension in Daventry.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Daventry like to extend?

Daventry has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.

How a side return extension in Daventry comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near Daventry

We also build side return extensions in nearby Rugby (9.0 miles) and Northampton (11.7 miles).

Other work in Daventry:

All rear extensions in Daventry

FAQ

Side return extension questions in Daventry

How long does a rear extension take to build in Daventry?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

Do you handle building control in Daventry?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How much does a side return extension cost in Daventry?

As a guide, £2,230–£3,690 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £27,000–£44,000 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.