Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Mold, North Wales

Side return extension in Mold

For homes in Mold, a side return extension is often the simplest way to gain space without moving. Infilling the narrow passage beside a Victorian or Edwardian back addition. We take it from survey to completion certificate.

We cover Mold (CH7) as part of our North Wales work. In Mold we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Mold?

For Mold we work from the Wales rate: £2,140–£3,530 per square metre of new floor, including VAT, standard specification. Prices in Wales sit below our West Midlands baseline; sloping sites are the main variable.

Side return extension prices in Mold
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£25,500–£42,500
2.5 m wide × 7 m deep (17.5 m²)£37,500–£62,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Mold?

The planning route for a side return extension in Mold is set by Wales's householder rules and your council.

Welsh side-extension rules limit a single-storey side addition to 4 metres high and a 50% increase in the width of the original house, with tighter limits in conservation areas. Wraparounds usually need a planning application.

In Wales, as in England, the Party Wall etc. Act 1996 requires notice to neighbours before work to a shared wall or excavation near their foundations.

Conservation areas, National Parks and National Landscapes restrict permitted development in Wales, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Mold like to extend?

Older terraces near the centre and post-war semis further out are typical of Mold. Sloping sites are common in Wales, so floor levels and retaining walls are designed at the start.

How a side return extension in Mold comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Mold

From Mold, the nearest places we also cover are Buckley (2.4 miles) and Deeside (4.9 miles).

Other work in Mold:

All rear extensions in Mold

FAQ

Side return extension questions in Mold

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do I need a party wall agreement?

In Wales, usually yes if the extension is on or near a shared boundary or close to a neighbour's foundations. We serve the notices.

How much space does a side return add?

Typically 8 to 18 square metres, enough to turn a galley kitchen into a kitchen-diner with an island.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need planning permission for a rear extension in Mold?

Often not for a single-storey rear extension of up to 4 metres under Welsh permitted development. Wales has no prior approval route for deeper extensions.

How long does a rear extension take to build in Mold?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price