Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Halewood, Merseyside

Side return extension in Halewood

Side return extension in Halewood: infilling the narrow passage beside a Victorian or Edwardian back addition. We measure the house, show you what the rules allow, price it in writing and build it.

Halewood and its postcode districts L26 are part of our Merseyside coverage. Side return projects in Halewood usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Halewood?

A side return extension in Halewood is priced at £2,160–£3,570 per square metre including VAT as a guide, before kitchen fit-out and fees. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Side return extension prices in Halewood
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£26,000–£43,000
2.5 m wide × 7 m deep (17.5 m²)£38,000–£62,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Halewood?

Here is how the rules in England apply to a side return extension in Halewood.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Halewood like to extend?

Stone and brick terraces are common around Halewood. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a side return extension in Halewood comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Halewood

We also build side return extensions in nearby Speke (1.4 miles) and Hunts Cross (1.4 miles).

Other work in Halewood:

All rear extensions in Halewood

FAQ

Side return extension questions in Halewood

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

How long does a rear extension take to build in Halewood?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price