Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Dingle, Merseyside

Side return extension in Dingle

Side return extension in Dingle: infilling the narrow passage beside a Victorian or Edwardian back addition. We measure the house, show you what the rules allow, price it in writing and build it.

Dingle is covered from our Merseyside round, including L1, L8 and L17. Side returns suit the Victorian and Edwardian terraces found across parts of Merseyside, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Dingle?

Guide prices for a side return extension in Dingle start from our North West England rate of £2,160–£3,570 per square metre, including VAT. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Side return extension prices in Dingle
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£26,000–£43,000
2.5 m wide × 7 m deep (17.5 m²)£38,000–£62,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a side return extension in Dingle?

Planning for a side return extension in Dingle follows the English householder rules.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Dingle like to extend?

Dingle has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.

How a side return extension in Dingle comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near Dingle

Close by, we work in Mossley Hill, about 2.0 miles away, and Kensington, about 2.1 miles away.

Other work in Dingle:

All rear extensions in Dingle

FAQ

Side return extension questions in Dingle

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need planning permission for a rear extension in Dingle?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I combine a side return with a rear extension?

Yes; that is a wraparound extension, and it gives the biggest open-plan room a terrace can have.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Dingle?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price