Side return extension in Evington
We plan and build side return extensions for homeowners in Evington. Infilling the narrow passage beside a Victorian or Edwardian back addition. Start with a free site visit, then a written price once the design is agreed.
Evington is covered from our Leicestershire and Rutland round, including LE1, LE2 and LE5. In Evington we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a side return extension cost in Evington?
Guide prices for a side return extension in Evington start from our East Midlands rate of £2,230–£3,690 per square metre, including VAT. East Midlands prices sit a little below our West Midlands baseline.
| Size | Guide price inc VAT |
|---|---|
| 2 m wide × 6 m deep (12 m²) | £27,000–£44,000 |
| 2.5 m wide × 7 m deep (17.5 m²) | £39,000–£64,500 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a side return extension in Evington?
The planning route for a side return extension in Evington is set by England's householder rules and your council.
In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.
Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Evington like to extend?
Red-brick terraces and semis are typical of Evington. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.
How a side return extension in Evington comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Side return extensions near Evington
Close by, we work in Oadby, about 0.8 miles away, and Wigston Magna, about 1.7 miles away.
- Side return extension in Oadby
- Side return extension in Wigston Magna
- Side return extension in Aylestone
- Side return extension in Humberstone
- Side return extension in Leicester
Other work in Evington:
FAQ
Side return extension questions in Evington
How much does a side return extension cost in Evington?
As a guide, £2,230–£3,690 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £27,000–£44,000 at that rate. Your written price follows the survey.
Can you match the brick or stone on my Evington house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Where does the drainage go?
Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
How long does a rear extension take to build in Evington?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do you handle building control in Evington?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.