Leyland, Lancashire
Side return extension in Leyland
Infilling the narrow passage beside a Victorian or Edwardian back addition. If you live in Leyland and want to know what a side return extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Leyland sits in Lancashire, with postcode districts including PR25 and PR26. Side return projects in Leyland usually start with a drainage survey of the side passage.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a side return extension cost in Leyland?
In Leyland, our guide for a side return extension is £2,160–£3,570 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 2 m wide × 6 m deep (12 m²) | £26,000–£43,000 |
| 2.5 m wide × 7 m deep (17.5 m²) | £38,000–£62,500 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a side return extension in Leyland?
Whether your side return extension in Leyland needs a planning application depends on its size, your house and any local restrictions.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Leyland like to extend?
Leyland has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.
How a side return extension in Leyland comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Side return extensions near Leyland
We also build side return extensions in nearby Clayton-le-Woods (0.8 miles) and Chorley (4.4 miles).
- Side return extension in Clayton-le-Woods
- Side return extension in Chorley
- Side return extension in Preston
- Side return extension in Horwich
- Side return extension in Blackburn
Other work in Leyland:
FAQ
Side return extension questions in Leyland
Can you match the brick or stone on my Leyland house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
How much space does a side return add?
Typically 8 to 18 square metres, enough to turn a galley kitchen into a kitchen-diner with an island.
How long does a rear extension take to build in Leyland?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.