Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

New Cross, Greater London

Side return extension in New Cross

Infilling the narrow passage beside a Victorian or Edwardian back addition. If you live in New Cross and want to know what a side return extension would cost and whether it needs planning, start with the online guide price or a free site visit.

New Cross is covered from our Greater London round, including SE4, SE8 and SE14. Side return projects in New Cross usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in New Cross?

In New Cross, our guide for a side return extension is £2,990–£4,940 per square metre including VAT for a standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Side return extension prices in New Cross
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£36,000–£59,500
2.5 m wide × 7 m deep (17.5 m²)£52,500–£86,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a side return extension in New Cross?

Whether your side return extension in New Cross needs a planning application depends on its size, your house and any local restrictions.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in New Cross like to extend?

Period terraces in New Cross sit alongside flats, and the difference matters: houses usually keep permitted development rights, while flats and maisonettes need planning permission for any rear extension. Side returns suit the Victorian and Edwardian terraces found across parts of Greater London, where the kitchen sits in a narrow back addition.

How a side return extension in New Cross comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near New Cross

Close by, we work in Brockley, about 0.8 miles away, and Greenwich, about 1.2 miles away.

Other work in New Cross:

All rear extensions in New Cross

FAQ

Side return extension questions in New Cross

What postcode areas do you cover around New Cross?

Including SE4, SE8 and SE14, and the surrounding Greater London area.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

How long does a rear extension take to build in New Cross?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price