Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Stroud, Gloucestershire

Side return extension in Stroud

Side return extension in Stroud: infilling the narrow passage beside a Victorian or Edwardian back addition. We measure the house, show you what the rules allow, price it in writing and build it.

Stroud and its postcode districts GL5, GL6 and GL10 are part of our Gloucestershire coverage. Side returns suit the Victorian and Edwardian terraces found across parts of Gloucestershire, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Stroud?

For Stroud we work from the South West England rate: £2,390–£3,950 per square metre of new floor, including VAT, standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Side return extension prices in Stroud
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£28,500–£47,500
2.5 m wide × 7 m deep (17.5 m²)£42,000–£69,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a side return extension in Stroud?

The planning route for a side return extension in Stroud is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Stroud like to extend?

Stroud has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.

How a side return extension in Stroud comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Stroud

We also build side return extensions in nearby Dursley (8.1 miles) and Gloucester (8.2 miles).

Other work in Stroud:

All rear extensions in Stroud

FAQ

Side return extension questions in Stroud

Can you match the brick or stone on my Stroud house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do you handle building control in Stroud?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Stroud?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price