Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hadleigh, Essex

Side return extension in Hadleigh

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Hadleigh and the surrounding area, with one contract from the first survey to building control sign-off.

Hadleigh is covered from our Essex round, including SS6, SS7 and SS8. Side returns suit the Victorian and Edwardian terraces found across parts of Essex, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Hadleigh?

In Hadleigh, our guide for a side return extension is £2,440–£4,030 per square metre including VAT for a standard specification. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Side return extension prices in Hadleigh
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£29,500–£48,500
2.5 m wide × 7 m deep (17.5 m²)£42,500–£70,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Hadleigh?

Planning for a side return extension in Hadleigh follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Hadleigh like to extend?

Hadleigh mixes Victorian terraces with 1930s semis, so both side returns and full-width kitchen extensions suit houses here.

How a side return extension in Hadleigh comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Hadleigh

Neighbouring places we cover include South Benfleet (2.2 miles) and Rayleigh (2.3 miles).

Other work in Hadleigh:

All rear extensions in Hadleigh

FAQ

Side return extension questions in Hadleigh

Can you match the brick or stone on my Hadleigh house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do you handle building control in Hadleigh?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

What postcode areas do you cover around Hadleigh?

Including SS6, SS7 and SS8, and the surrounding Essex area.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Hadleigh?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price