Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hastings, East Sussex

Side return extension in Hastings

We plan and build side return extensions for homeowners in Hastings. Infilling the narrow passage beside a Victorian or Edwardian back addition. Start with a free site visit, then a written price once the design is agreed.

Hastings and its postcode districts TN34, TN35, TN37 and TN38 are part of our East Sussex coverage. Side return projects in Hastings usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Hastings?

For Hastings we work from the South East England rate: £2,580–£4,260 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Side return extension prices in Hastings
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£31,000–£51,000
2.5 m wide × 7 m deep (17.5 m²)£45,000–£74,500

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a side return extension in Hastings?

The planning route for a side return extension in Hastings is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Hastings like to extend?

Commuter semis and detached houses make up much of Hastings, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a side return extension in Hastings comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near Hastings

Neighbouring places we cover include St Leonards-on-Sea (1.5 miles) and Bexhill-on-Sea (4.8 miles).

Other work in Hastings:

All rear extensions in Hastings

FAQ

Side return extension questions in Hastings

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

What postcode areas do you cover around Hastings?

Including TN34, TN35, TN37 and TN38, and the surrounding East Sussex area.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

How long does a rear extension take to build in Hastings?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do you handle building control in Hastings?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price