Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Canford Heath, Dorset

Side return extension in Canford Heath

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Canford Heath and the surrounding area, with one contract from the first survey to building control sign-off.

Canford Heath is covered from our Dorset round, including BH12, BH17 and BH18. In Canford Heath we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Canford Heath?

A side return extension in Canford Heath is priced at £2,390–£3,950 per square metre including VAT as a guide, before kitchen fit-out and fees. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Side return extension prices in Canford Heath
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£28,500–£47,500
2.5 m wide × 7 m deep (17.5 m²)£42,000–£69,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Canford Heath?

Planning for a side return extension in Canford Heath follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Canford Heath like to extend?

Canford Heath has Victorian terraces nearer the centre and post-war semis on the edges. Sloping gardens are frequent, which affects floor levels and steps down to the patio.

How a side return extension in Canford Heath comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near Canford Heath

From Canford Heath, the nearest places we also cover are Broadstone (1.2 miles) and Wimborne Minster (2.3 miles).

Other work in Canford Heath:

All rear extensions in Canford Heath

FAQ

Side return extension questions in Canford Heath

Is the site visit in Canford Heath free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

What postcode areas do you cover around Canford Heath?

Including BH12, BH17 and BH18, and the surrounding Dorset area.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

Do I need planning permission for a rear extension in Canford Heath?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Canford Heath?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price