Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Heavitree, Devon

Side return extension in Heavitree

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Heavitree and the surrounding area, with one contract from the first survey to building control sign-off.

Heavitree and its postcode districts EX1, EX2 and EX4 are part of our Devon coverage. Side returns suit the Victorian and Edwardian terraces found across parts of Devon, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Heavitree?

In Heavitree, our guide for a side return extension is £2,390–£3,950 per square metre including VAT for a standard specification. South West prices run slightly above our West Midlands baseline; natural stone to match the house is the main variable.

Side return extension prices in Heavitree
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£28,500–£47,500
2.5 m wide × 7 m deep (17.5 m²)£42,000–£69,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a side return extension in Heavitree?

Whether your side return extension in Heavitree needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Heavitree like to extend?

Stone-built and rendered houses are common around Heavitree, so matching the walling is a design decision in its own right: natural stone, reconstituted stone or a render finish across old and new. In Heavitree we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

How a side return extension in Heavitree comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Heavitree

From Heavitree, the nearest places we also cover are Exeter (1.4 miles) and Exmouth (8.2 miles).

Other work in Heavitree:

All rear extensions in Heavitree

FAQ

Side return extension questions in Heavitree

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can you match the brick or stone on my Heavitree house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How much space does a side return add?

Typically 8 to 18 square metres, enough to turn a galley kitchen into a kitchen-diner with an island.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

What postcode areas do you cover around Heavitree?

Including EX1, EX2 and EX4, and the surrounding Devon area.

How long does a rear extension take to build in Heavitree?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price