Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Matlock, Derbyshire

Side return extension in Matlock

Thinking about a side return extension in Matlock? Infilling the narrow passage beside a Victorian or Edwardian back addition. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Matlock is covered from our Derbyshire round, including DE4. In Matlock we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Matlock?

In Matlock, our guide for a side return extension is £2,230–£3,690 per square metre including VAT for a standard specification. East Midlands prices sit a little below our West Midlands baseline.

Side return extension prices in Matlock
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,000–£44,000
2.5 m wide × 7 m deep (17.5 m²)£39,000–£64,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Matlock?

Whether your side return extension in Matlock needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Matlock like to extend?

Red-brick terraces and semis are typical of Matlock. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a side return extension in Matlock comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Matlock

Neighbouring places we cover include Alfreton (7.7 miles) and Belper (8.5 miles).

Other work in Matlock:

All rear extensions in Matlock

FAQ

Side return extension questions in Matlock

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How much does a side return extension cost in Matlock?

As a guide, £2,230–£3,690 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £27,000–£44,000 at that rate. Your written price follows the survey.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Matlock?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Matlock?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price