Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Ossett, West Yorkshire

Semi-detached rear extension in Ossett

Single or two-storey extensions for semi-detached houses, with side access and one party wall. We design, get the approvals for and build rear extensions for semi-detached houses in Ossett and the surrounding area, with one contract from the first survey to building control sign-off.

We cover Ossett (WF2, WF4 and WF5) as part of our West Yorkshire work. Semi-detached houses are common across West Yorkshire, and their side access makes rear extensions quicker to build.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Ossett?

Guide prices for a semi-detached rear extension in Ossett start from our Yorkshire and the Humber rate of £1,770–£2,880 per square metre, including VAT. Yorkshire prices sit below our West Midlands baseline; matching natural stone is the main variable.

Semi-detached rear extension prices in Ossett
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,000–£34,500
4 m wide × 5 m deep (20 m²)£35,500–£57,500
4 m wide × 6 m deep (24 m²)£42,500–£69,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a semi-detached rear extension in Ossett?

Planning for a semi-detached rear extension in Ossett follows the English householder rules.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Ossett like to extend?

Ossett has through terraces and some back-to-backs as well as later semis; back-to-backs have little or no rear space, so we look at side or loft options there.

How a semi-detached rear extension in Ossett comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Semi-detached rear extensions near Ossett

Close by, we work in Horbury, about 1.6 miles away, and Dewsbury, about 2.1 miles away.

Other work in Ossett:

All rear extensions in Ossett

FAQ

Semi-detached rear extension questions in Ossett

Can you match the brick or stone on my Ossett house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a semi extension take?

10 to 16 weeks on site for a single-storey extension.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How long does a rear extension take to build in Ossett?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price