Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Dorking, Surrey

Semi-detached rear extension in Dorking

Semi-detached rear extension in Dorking: single or two-storey extensions for semi-detached houses, with side access and one party wall. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Dorking (KT23 and RH4) as part of our Surrey work. Where a Dorking semi already has a small lean-to at the back, we usually replace it rather than extend it.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Dorking?

A semi-detached rear extension in Dorking is priced at £2,130–£3,470 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Semi-detached rear extension prices in Dorking
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a semi-detached rear extension in Dorking?

The planning route for a semi-detached rear extension in Dorking is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Dorking like to extend?

Dorking has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a semi-detached rear extension in Dorking comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Semi-detached rear extensions near Dorking

Close by, we work in Great Bookham, about 3.7 miles away, and Leatherhead, about 4.4 miles away.

Other work in Dorking:

All rear extensions in Dorking

FAQ

Semi-detached rear extension questions in Dorking

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

What postcode areas do you cover around Dorking?

Including KT23 and RH4, and the surrounding Surrey area.

Single or two-storey on a semi?

Two-storey if you need bedrooms, single-storey if you need a bigger kitchen. Planning risk is lower for single-storey.

Is the site visit in Dorking free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can you match the brick or stone on my Dorking house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Dorking?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price