Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Scunthorpe, Lincolnshire

Semi-detached rear extension in Scunthorpe

Thinking about a semi-detached rear extension in Scunthorpe? Single or two-storey extensions for semi-detached houses, with side access and one party wall. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Scunthorpe and its postcode districts DN15, DN16 and DN17 are part of our Lincolnshire coverage. Where a Scunthorpe semi already has a small lean-to at the back, we usually replace it rather than extend it.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Scunthorpe?

A semi-detached rear extension in Scunthorpe is priced at £1,840–£3,010 per square metre including VAT as a guide, before kitchen fit-out and fees. East Midlands prices sit a little below our West Midlands baseline.

Semi-detached rear extension prices in Scunthorpe
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£22,000–£36,000
4 m wide × 5 m deep (20 m²)£37,000–£60,000
4 m wide × 6 m deep (24 m²)£44,000–£72,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a semi-detached rear extension in Scunthorpe?

Here is how the rules in England apply to a semi-detached rear extension in Scunthorpe.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Scunthorpe like to extend?

Scunthorpe has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.

How a semi-detached rear extension in Scunthorpe comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Semi-detached rear extensions near Scunthorpe

Neighbouring places we cover include Brough (10.9 miles) and Barton upon Humber (11.5 miles).

Other work in Scunthorpe:

All rear extensions in Scunthorpe

FAQ

Semi-detached rear extension questions in Scunthorpe

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Single or two-storey on a semi?

Two-storey if you need bedrooms, single-storey if you need a bigger kitchen. Planning risk is lower for single-storey.

How long does a rear extension take to build in Scunthorpe?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Scunthorpe?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price