Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Broadstairs, Kent

Semi-detached rear extension in Broadstairs

For homes in Broadstairs, a semi-detached rear extension is often the simplest way to gain space without moving. Single or two-storey extensions for semi-detached houses, with side access and one party wall. We take it from survey to completion certificate.

We cover Broadstairs (CT10) as part of our Kent work. Where a Broadstairs semi already has a small lean-to at the back, we usually replace it rather than extend it.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Broadstairs?

A semi-detached rear extension in Broadstairs is priced at £2,130–£3,470 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Semi-detached rear extension prices in Broadstairs
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a semi-detached rear extension in Broadstairs?

Planning for a semi-detached rear extension in Broadstairs follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Broadstairs like to extend?

Broadstairs has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a semi-detached rear extension in Broadstairs comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Semi-detached rear extensions near Broadstairs

Close by, we work in Ramsgate, about 1.9 miles away, and Margate, about 2.9 miles away.

Other work in Broadstairs:

All rear extensions in Broadstairs

FAQ

Semi-detached rear extension questions in Broadstairs

How long does a rear extension take to build in Broadstairs?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Is the site visit in Broadstairs free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can I match pebbledash or render?

Yes. Many semis are refinished with new render across the whole back elevation so old and new match.

Do you handle building control in Broadstairs?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

What postcode areas do you cover around Broadstairs?

Including CT10, and the surrounding Kent area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price