Bickley, Greater London
Semi-detached rear extension in Bickley
Thinking about a semi-detached rear extension in Bickley? Single or two-storey extensions for semi-detached houses, with side access and one party wall. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Bickley is covered from our Greater London round, including BR1, BR2 and BR7. In Bickley we measure the attached neighbour's extension at the survey, because it often sets the sensible depth for yours.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a semi-detached rear extension cost in Bickley?
In Bickley, our guide for a semi-detached rear extension is £2,470–£4,030 per square metre including VAT for a standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £29,500–£48,500 |
| 4 m wide × 5 m deep (20 m²) | £49,500–£80,500 |
| 4 m wide × 6 m deep (24 m²) | £59,500–£96,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a semi-detached rear extension in Bickley?
Whether your semi-detached rear extension in Bickley needs a planning application depends on its size, your house and any local restrictions.
In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Bickley like to extend?
Bickley is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a semi-detached rear extension in Bickley comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Semi-detached rear extensions near Bickley
We also build rear extensions for semi-detached houses in nearby Chislehurst (1.5 miles) and Orpington (2.9 miles).
- Semi-detached rear extension in Chislehurst
- Semi-detached rear extension in Orpington
- Semi-detached rear extension in Sidcup
- Semi-detached rear extension in Beckenham
- Semi-detached rear extension in Eltham
Other work in Bickley:
FAQ
Semi-detached rear extension questions in Bickley
Do I need planning permission for a rear extension in Bickley?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Can I match pebbledash or render?
Yes. Many semis are refinished with new render across the whole back elevation so old and new match.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
How long does a rear extension take to build in Bickley?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.